cammerfe
Dedicated LVC Member
Mods
Tie together this thread with the recent one on the age of those who visit here, and the whole thing comes into perspective.
To answer the question asked, I'll make a list that will fall into the 25 K parameter but not try to assign costs. And I'll list already done things as part of the project.
1. Body modifications and repair
A. Hood pins
B. Mesh grille
C. Front splitter
D. Belly pan
E. Finish passenger doors alignment, etc.
F. Remove road rash, chips, etc.
G. Trunk spoiler
H. Repaint
2. Interior
A. Roll Cage including padding and net
B. Fire suppression system
C. 6-point safety harness
D. Gauge and switch panel
3. Trunk
A. Methanol fuel system (Cell, pump, stainless braid to and from engine)
B. Wiring mods (HD cable from alt to batt, connections to gauges, Charging links in
trunk lid)
C. Air boxes in quarters (with duct work from NACA duct openings and turbos)
D. Nitrous oxide bottle installation with remote opener and transducer operated
heater
4. Engine and trans and R-E
A. four litre AJ engine
1. Moldex crank
2. Ross custom pistons
3. GRP Aluminum rods
4. ExtrudeHone heads
5. Comp cams
6. RSR Dry sump system
7. A-M intake manifold
8. MSD ignition
There are other modifications done and planned, but I've run out of time for now
KS
Tie together this thread with the recent one on the age of those who visit here, and the whole thing comes into perspective.
To answer the question asked, I'll make a list that will fall into the 25 K parameter but not try to assign costs. And I'll list already done things as part of the project.
1. Body modifications and repair
A. Hood pins
B. Mesh grille
C. Front splitter
D. Belly pan
E. Finish passenger doors alignment, etc.
F. Remove road rash, chips, etc.
G. Trunk spoiler
H. Repaint
2. Interior
A. Roll Cage including padding and net
B. Fire suppression system
C. 6-point safety harness
D. Gauge and switch panel
3. Trunk
A. Methanol fuel system (Cell, pump, stainless braid to and from engine)
B. Wiring mods (HD cable from alt to batt, connections to gauges, Charging links in
trunk lid)
C. Air boxes in quarters (with duct work from NACA duct openings and turbos)
D. Nitrous oxide bottle installation with remote opener and transducer operated
heater
4. Engine and trans and R-E
A. four litre AJ engine
1. Moldex crank
2. Ross custom pistons
3. GRP Aluminum rods
4. ExtrudeHone heads
5. Comp cams
6. RSR Dry sump system
7. A-M intake manifold
8. MSD ignition
There are other modifications done and planned, but I've run out of time for now
KS